Services and solutions
AUTO-CHEMICAL CONTROL OF THE STEAM AND WATER CIRCUIT
- Equipment from leading manufacturers of the chemical industry
- System solutions: sample preparation, online control, analysis and data processing
- 25 years of experience
- From project assignment to startup and commissioning
АВТОМАТИЧНІ АНАЛІЗАТОРИ ТА СИСТЕМИ ОНЛАЙН КОНТРОЛЮ РІДКИХ ПОТОКІВ
- Quality control and reduction of product losses
- Optimization of SIS operation
- Control of phase transitions in fluid flows
- Product identification in the flow
- From project assignment to startup and commissioning
- Reagent dosing systems
WASTEWATER TREATMENT
- Industrial and municipal buildings
- Biogas production from wastewater and sludge
- Reconstruction and new construction
- Process control system and wastewater inlet/outlet control
- From project assignment to startup and commissioning
EARLY WARNING STATIONS ON RIVERS AND MONITORING OF TREATED EFFLUENTS
- Automatic early warning stations at water intakes and
- Monitoring of wastewater treatment plant discharges
- Compliance with European standards
- From project assignment to startup and commissioning
CONDITIONING AND SAMPLING
- Food industry
- Chemicals (acids, alkalis)
- Suspensions, viscous and paste-like products
- Petroleum products
- Pellets, wicker, grain
- Preparation of technical specifications, manufacturing, installation, adjustment
PROJECTS FOR THE RESTORATION OF THE COUNTRY
We are in numbers
About us
Working on turnkey industrial engineering projects, we use advanced technologies and equipment that ensure: a stable technological process at power plants with minimal resource consumption thanks to modern online monitoring of steam and water circuits; wastewater treatment to meet discharge standards to keep our rivers clean. We offer: automatic early warning stations at water intakes and monitoring of treated wastewater discharges; production flow monitoring systems to control product quality and reduce product losses; construction and reconstruction of modern wastewater treatment facilities. Since the beginning of the war, we have been participating in programs to rebuild the country - the country of the future. Building Europe where we live.
Our advantages
Our projects
Autochemical control of the steam and water circuit
Industrial and municipal wastewater treatment
Stations and systems for automatic monitoring of natural and waste water
Stations for automatic monitoring of treated wastewater in the BSA discharge channel
Automatic quality control system for groundwater treatment Pumping station Budzen 2, Horodok district, Lviv region
Automatic monitoring system of technological parameters of wastewater treatment SBR
Projects to restore the country
Our news
FREQUENTLY ASKED QUESTIONS
1. What international documents regulate the parameters of chemical on-line monitoring of the steam and water circuit?
The composition and requirements for automatic control systems (ACS) for feedwater and steam for power plants are regulated by international standards IAPWS or EPRI (Electric Power Research Institute, USA) and Vereinigung der Grosskraftwerksbetreiber (Association of Large Power Plant Operators) (VGB), Germany.
2. Do the SWAN ANALYTICAL INSTRUMENT analyzers cover the entire specification of chemical on-line monitoring parameters of the steam and water circuit regulated by international documents?
For example, SWAN ANALYTICAL INSTRUMENT analyzers have all the specifications for chemical on-line monitoring of the steam and water circuit regulated by international documents.
3. What are the maximum temperature and pressure values for which SWAN ANALYTICAL INSTRUMENT industrial chemical on-line monitoring analyzers are designed? T 45 °C; P 0.5 bar
4. What are the maximum temperature and pressure values for which SENTRY EQUIPMENT sample preparation devices are designed?
5. How much will the rinse water consumption be reduced when using the AquaScat turbidity photometer?
6. What is the payback period for the PhaseGuard analyzer?
The payback period of the PhaseGuard analyzer is 5-6 months.
7. Under what conditions is it advisable to use vertical high load anaerobic digesters (VHLAD) for wastewater treatment?
The payback period of the PhaseGuard analyzer is 5-6 months.
8. What is the load range of the WQSW for COD kg/m3-day?
9. What amount of biogas per day does a WRF produce with a load of 5500 m3/day and an average COD of 3800 g/m3?













